Toyota Camry

1992-1997 of release

Repair and operation of the car



Kamri's Toyota
+ General data
- 1. Maintenance
   1.2. Frequency of service
   - 1.3. Maintenance
      + 1.3.1. Each 400 km or weekly
      + 1.3.2. Each 5 000 km or 3 months
      - 1.3.3. Each 10 000 km or 6 months
         1.3.3.1.1. Type A
         1.3.3.1.2. Type B
         1.3.3.2. Check of a free wheeling and height of installation of a pedal of coupling
         + 1.3.3.3. Check and service of the accumulator
         + 1.3.3.4. Check and replacement of a driving belt
         - 1.3.3.5. Check of tightness of hoses and effluence of liquids
            1.3.3.5.1. Fuel hoses
            1.3.3.5.2. Unknown leak of liquids
            1.3.3.5.3. Vacuum hoses
         1.3.3.6. Check of the cooling system
         1.3.3.7. Change of provision of installation of tires
      + 1.3.4. Each 25 000 km or 12 months
      + 1.3.5. Each 50 000 km or 24 months
      + 1.3.6. Each 100 000 km or 48 months
+ 2. Engine
+ 3. Six-cylinder V6 engines
+ 4. Capital repairs of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Toxicity decrease
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment


1.3.3.5. Check of tightness of hoses and effluence of liquids

GENERAL INFORMATION

Defects of hoses of the cooling system
 

Leak in the cooling system usually is found on white or colors of a rust to a raid in the area adjoining leak.

PERFORMANCE ORDER

1. Carefully check a radiator and hoses of cooling liquid on all length. Replace hoses with cracks, gaps and signs of aging. It is easier to find cracks if to press a hose. Pay special attention to collars which attach hoses to cooling system elements. Collars of fastening of a hose which were strongly tightened, can cause a gap or a hose puncture, leaks in the cooling system will be result of that.

2. Examine all components of the cooling system (hoses, surfaces of sockets, etc.) regarding leaks. If to an obnaruzha ny any problems of similar character with components of system, replace this component or laying.