1. Installation is made in sequence, the return to removal. |
|
2. After installation of a door check that the gap on perimeter of a door was everywhere identical and also that the external surface of a door was aflush with other elements of a body. For adjustment of a gap on perimeter of a door weaken bolts of fastening of hinges of a door and, moving a door, adjust its situation then tighten fastening bolts. |
|
3. For installation of a door aflush with other elements of a body weaken bolts of fastening of the hinge of a door to a door and otregul to a ruyta the provision of a door then tighten bolts. |
|
4. Check that the door lock accurately comes on the shock plate located on a rack. If adjustment is necessary, weaken the screws fixing a shock plate, move a shock plate and tighten fastening screws. |