Toyota Camry

1992-1997 of release

Repair and operation of the car



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
+ 4. Capital repairs of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Toxicity decrease
- 9. Transmission
   9.2. General information
   9.3. Gear shifting cables
   9.4. Gear shifting lever
   9.5. Switch of light of a backing
   + 9.6. Removal and installation of a transmission
   9.7. Repair of a transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment


9.3. Gear shifting cables

GENERAL INFORMATION

Lever and cables of gear shifting
1 – gear shifting cable;
2 – clamp;
3 – washer;
4 – spring ring;
5 – plugs;
6 – plate;
7 – gear shifting lever handle;
8 – gear shifting lever;
9 – laying;
10 – persistent ring;
11 – nest;
12 – laying;
13 – wavy washer;
14 – spring;
15 – lever;
16 – plugs;
17 – gear shifting cable;
18 – lever

The lever and cables of gear shifting on models since 1994
1 – gear shifting cable;
2 – clamp;
3 – sealing ring;
4 – clamp;
5 – brackets;
6 – gear shifting lever handle;
7 – gear shifting lever assembled;
8 – bracket;
9 – bracket;
10 – washer;
11 – brackets;
12 – bracket;
13 – washer;
14 – gear shifting cable;
15 – bracket;
16 – washer

PERFORMANCE ORDER
1. Remove the central console.
2. Lift the car and record on supports.
3. Remove brackets and washers of cables of gear shifting to a transmission (see rice. Lever and cables of gear shifting).
4. Remove big clamps which fix a cover of cables of gear shifting to a transmission arm.
5. Remove brackets and washers of fastening of cables of gear shifting to the gear shifting lever.
6. Remove clamps of fastening of a cover of a cable of gear shifting to the gear shifting lever basis.
7. Take gear shifting cables from under the car.
8. Installation is made in sequence, the return to removal.