Toyota Camry

1992-1997 of release

Repair and operation of the car



Kamri's Toyota
+ General data
+ 1. Maintenance
- 2. Engine
   2.2. Operations on repair of the engine on the car
   2.3. Top dead point of the first cylinder
   + 2.4. Cover of a head of the block of cylinders
   + 2.5. Inlet collector
   + 2.6. Final collector
   + 2.7. Gear belt and pulleys
   2.8. Replacement of a forward sealing ring of a cranked shaft
   2.9. Replacement of a sealing ring of a camshaft
   + 2.10. Camshaft and pushers
   - 2.11. Head of the block of cylinders
      2.11.2. Installation
   + 2.12. Oil pallet
   + 2.13. Oil pump
   + 2.14. Drive flywheel / plate
   2.15. Replacement of a back sealing ring of a cranked shaft
   + 2.16. Suspension bracket of the power unit
+ 3. Six-cylinder V6 engines
+ 4. Capital repairs of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Toxicity decrease
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment


2.11.2. Installation

PERFORMANCE ORDER

1. The interfaced surfaces of a head and the block of cylinders have to be absolutely pure. For their cleaning use a firm plastic or wooden scraper. When cleaning be careful as it is very easy to damage an aluminum alloy.

2. Check that the deposit did not get to oil and water canals. It is especially important for the lubrication system as the deposit can block supply of oil to engine components. If necessary clear channels, check the interfaced surfaces of a head and the block of cylinders for existence of notches, deep scratches and other damages. If defects small, they can be removed with machining, but at major defects of a detail are subject to replacement.

3. Clear openings under bolts in the block of cylinders. Zavinchiva scientific research institute of a bolt in the opening filled with oil can break off the block because of hydraulic pressure.
4. Using a metal ruler and the probe, check ploskost a nost of the interfaced surfaces.
5. Install new laying of a head of the block of cylinders on adjusting pins in the block of cylinders.
6. Establish a head on the block of cylinders of the engine.
7. Grease a carving of bolts of fastening of a head of the block of cylinders with a thin layer of engine oil.

8. Establish bolts of fastening of a head of the block of cylinders and tighten them the demanded moment in some stages in the sequence presented in drawing.
9. Further installation is made in sequence, the return to removal.
10. Check and, if necessary, adjust gaps of valves.
11. Fill in cooling liquid in the cooling system. Establish a new oil filter and add engine oil.