Toyota Camry

1992-1997 of release

Repair and operation of the car



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Capital repairs of engines
   4.2. General information
   4.3. Check of a compression
   4.4. Recommendations about removal of the engine
   + 4.5. Removal and installation of the engine
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   - 4.12. Block of cylinders of the engine
      4.12.2. Check
      4.12.3. Honingovaniye of cylinders
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control of a side play of assembly of the balance weight (engine 5S-FE)
   4.17. Balance of assembly of the engine at capital repairs
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Start of the engine after capital repairs
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Toxicity decrease
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment


4.12. Block of cylinders of the engine

4.12.1. Cleaning

PERFORMANCE ORDER
1. Remove all details and electric sensors from the block of cylinders. For full cleaning remove technological caps. For removal of a technological cap, using a punch, turn a technological cap in a nest and...
2.... using flat-nose pliers, take it from the block of cylinders. 3. Also for removal of technological caps it is possible to drill a small opening in a cap and in an opening to screw in the self-cutting screw. Having pulled for a screw head, take a technological cap. On the engine 1MZ-FE technological caps fasten to the block of cylinders nuts.
4. Remove all traces of laying from the interfaced surfaces of the block of cylinders of the engine.
5. Remove all caps of the oil highway. At installation use new caps.
6. The most polluted places clear the ferry.
7. Clear all lubricant openings and the oil highway. Wash out all internal channels a stream of warm water until water does not leave pure. It is necessary to drain completely the block of cylinders and to grease with a thin butter layer all interfaced surfaces for prevention of emergence of corrosion. Also grease engine cylinders. If there is a compressed air, use it to accelerate process of drying and to blow all lubricant openings and highways.
8. Carefully clear all carving openings, using a tap with the corresponding carving then blow openings compressed air.
9. Install traffic jams to the oil highway in the block of cylinders of the engine and reliably fix them.
10. If the engine is not subject to immediate assembly, close the block of cylinders a big plastic bag to protect it from pollution.