Toyota Camry

1992-1997 of release

Repair and operation of the car



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Capital repairs of engines
   4.2. General information
   4.3. Check of a compression
   4.4. Recommendations about removal of the engine
   + 4.5. Removal and installation of the engine
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control of a side play of assembly of the balance weight (engine 5S-FE)
   4.17. Balance of assembly of the engine at capital repairs
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Start of the engine after capital repairs
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Toxicity decrease
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment


4.16. Control of a side play of assembly of the balance weight (engine 5S-FE)

GENERAL INFORMATION

Engine 5S-FE balance weight details

PERFORMANCE ORDER
1. Establish tags of a shaft of the balance weight No. 2 as shown in drawing.
2. Then turn a balance weight shaft so that the tag of D was combined with the index on a casing.
3. Using flat-nose pliers, record a shaft of the balance weight No. 2 from a provorachivaniye.
4. Using the indicator of hour type, measure a side play on a shaft of the balance weight No. 1.
5. Remove the indicator of hour type and turn a shaft of the balance weight No. 2 so that the tag E was combined with the index. Install the indicator of hour type and repeatedly measure a side play of a shaft of the balance weight No. 1.
6. Remove the indicator of hour type and turn a shaft of the balance weight No. 2 so that the tag of D was combined with the index. Install the indicator of hour type and repeatedly measure a side play of a shaft of the balance weight No. 1. If the measured side play anyway exceeds admissible limits, it is necessary to make repair of assembly of the balance weight at service station.